Welsh windfarm planned with turbine blades longer than a 100m sprint is to get even bigger ones

Welsh windfarm planned with turbine blades longer than a 100m sprint is to get even bigger ones

Wales Online

Published

Even Usain Bolt might struggle to run their length in under 10 seconds now

Full Article