The Essex cricket pitch that has the M25 running directly underneath it
Brentwood Gazette
Instead of cutting the cricket pitch in half to build the motorway, a decision was made to build a tunnel underneath it instead
Instead of cutting the cricket pitch in half to build the motorway, a decision was made to build a tunnel underneath it instead
A five-mile stretch of the M25 motorway between junctions 10 and 11, which has been closed in both directions and will remain..
Drivers faced heavy traffic and long delays on the motorway throughout the afternoon